CASE STUDY
THE MORAINE APARTMENTS
PROJECT:
The Moraine Apartments
FORMAT:
6 stories, 160 units
LOCATION:
Tacoma, Washington
PRODUCT:
Combilift 542 MR two levels with a pit tandem drive through
CAPACITY:
42 total cars in the parking system
CLIENT:
Walsh Construction
DESIGN:
Works Progress Architecture
The Moraine Apartments
The Moraine utilizes the Combilift 542 MR from Wöhr Autoparksysteme, Germany. Harding Autopark Systems facilitated all of the front end design, coordination, and installation. The system is specific to the project due to site constraints and excavation challenges to get the required parking for the unit count. To accommodate the sloping lot, we utilized a semi-automated parking system with the Combilift. The project is comprised of three systems. 42 total cars can be parked in this project. The Combilift is a semi-automated Puzzle Lift system where the users can all park independently. The ground breaking aspect of this are the sleek sliding safety gates, multi-row arrangement, and user operations for vehicle parking in and retrieval that are all facilitate through a SmartPhone App. The project was constructed by Walsh Construction. The architect was Works Partnership Architecture.